01/06/2023
John & Jean’s Shorehouse Welcome sign. I finally completed our welcome sign. The sign took much more time than I anticipated. The 3D Seagul took some time but the bulk of the time was the texture I designed and chose to use. The texture pass alone took 6 hours. I chose to texture the background rather than the letters to give it a water like look. I learned a few things along the road but I think it turned out pretty good. I am waiting to hear if the the boss likes it. I used 1.5” HUD sign material as the substrate which is impervious to weather. This is so important to stand up to the harsh weather conditions we endure on the waterfront. Next up is a Welcome Board.