06/10/2026
Traffic Alert for Barkley Regional Airport Passengers ⚠️ Road work is underway on U.S. 60 near KY 305, with reduced speed limits, lane restrictions, and traffic signal changes now in effect. If you're traveling to or from the airport, please allow a little extra time, slow down, and use caution in the work zone. The safety of our passengers, employees, and roadway workers is important. Visit the KYTC District 1 page to learn more.
𝗨𝗣𝗗𝗔𝗧𝗘 (𝗝𝘂𝗻𝗲 𝟭𝟬, 𝟮𝟬𝟮𝟲) – Speed reductions and signal changes will be implemented on U.S. 60 at KY 305 in McCracken County, near the active Highway Safety Improvement Project work zone.
➡️Lane restrictions are in effect in both directions.
❗️The work zone speed limit will be reduced to 35 mph, with 45-mph transition zones in advance. New speed limits will take effect once posted.
⚠️The intersection signal will operate in flashing mode:
▪️Through traffic on U.S. 60 will not stop. Motorists will encounter a flashing yellow signal, indicating they may proceed through the intersection with caution.
▪️Motorists on KY 305 will encounter a flashing red signal, requiring them to stop and yield to traffic on U.S. 60 before entering or crossing the highway.
These changes will remain in effect through project completion, expected by the end of the year, weather permitting.
_________
𝗔𝗗𝗩𝗜𝗦𝗢𝗥𝗬 (𝗠𝗮𝘆 𝟮𝟳, 𝟮𝟬𝟮𝟲) – A KYTC contractor is planning to implement lane restrictions on U.S. 60 near KY 305 in McCracken County starting on Monday, June 8.
This is part of a $2.3 million Highway Safety Improvement Project to convert the signalized intersection to a Reduced Conflict U-Turn (RCUT).
Work Zone: U.S. 60 from mile point 5.9 to 6.6, near KY 305 at Barkley Regional Airport. Also impacting U.S. 60 access at Rickman Road later in the project.
One-lane traffic in both directions. Watch for signs and use caution.
Expected to be completed by the end of the year, weather permitting.