01/06/2026
One last project to close out 2025!
VM removed and replaced 122β of concrete dock in Onset. Concrete sections were lifted away and the abutment hammered out to make way for the new GH piles and aluminum walkways with through flow decking, complete with a heavy duty 8x40 float