06/18/2026
A couple of major redos in the works at the shop. Homemade barge had fiberglass and plywood delamination for the bottom. Barge was unrigged and flipped to do a full bottom redo. Going back with composite decking, multiple layers of glass and new gelcoat.
1980 Glaston lake boat is having a new transom and stringers installed. Then new foam, floor and a full repaint.