07/26/2023
We had to take care of some follow-up items this morning at high tide at our recent project. The tide level and the lighting were just right for some photos.
Details -
• 4x40 Access stairs and landings
• 5x65 Pier
• 3x50 Aluminum arch ramp
• 12x20 floating dock with duralife composite decking.
Location - Stover’s Point. Harpswell
We are headed across the bay to Orr’s Island to start our next one.