10/13/2026
Inspection at delivery protects your purchase - Checking the container before you sign off confirms it matches your order, is structurally sound, and is ready for immediate use. It is your last opportunity to reject a unit without obligation!
Shipping container inspection quick reference:
what to check, what is acceptable, and when to reject.
Structure - What to check: Panels, roof, frame, corner posts Accept if: Minor dents, surface rust, paint wear Reject if: Holes, roof punctures, crushed corners, severe frame damage
Doors - What to check: Opening, hinges, locking bars, seals Accept if: Heavy operation on used units; may need lubrication Reject if: Doors won't close, seals broken, locking bars won't engage
Floor - What to check: Strength, cracks, cross-member separation Accept if: Surface wear, discoloration, cargo marks Reject if: Soft spots, missing sections, structural floor damage
Interior - What to check: Walls, ceiling, visible light entry Accept if: Minor cosmetic dents Reject if: Daylight through holes, punctures, major distortion
Placement - What to check: Level position, door direction, drop location Accept if: Container sits level and doors open as intended Reject if: Misplaced, unstable position, blocked door access