02/23/2022
This is what a month’s worth of prepping and van work looks like. It may not seem like much at first, but this van already has most of the grunt work completed! Following our typical build sequence, we’ve accomplished (for both vans): moving into our new work space, electrical wiring, fan installation, window installation, partial insulation, foam and fabric on the ribs (not pictured as complete), most of the ceiling installed, and all the wall panels cut out and ready to be covered in fabric. That’s a lot of time consuming work!
Out of all the projects, I think gluing foam and fabric takes the longest. It takes about one 8-hour day per van to glue foam on the ribs and then another day to glue fabric (so four 8-hour days total for both vans).
I consider us slightly ahead of schedule, at this point! 😍