11/03/2025
10/25/2025, The mess at the end of the track near Michigan Ave. Contractor that pulled the Michigan Ave. road crossing out for L.M.U. didn't bother to cut the rails. Instead used a big excavator to rip the road crossing out and litterally snapped the rails in two. They left us this mess.