03/25/2026
When one of the nation's largest interstate natural gas pipeline systems was faced with a bottleneck, we stepped up to the challenge.
We determined that a 3,407-foot-long horizontal direction drill (HDD) installation of a 42-inch steel pipe had the highest probability for success. The HDD was conducted under a section of river with steep slopes, challenging terrain, and difficult geology.
Read more about this project and others at https://brnw.ch/21x132Y...