01/02/2026
After 3 years of work, Goat Yard Marine has finalized the purchase of the 9-acre property from the City of Detroit located between the existing GY properties and the Detroit River. This major purchase will allow us to move into our next phase of expansion of our operations.
We have a great team of engineers, architects, attorneys, and other experts that have been working on the property purchase, engineering analysis, site layout, and design for our expansion. We are moving into the approval/permit process while we figure out how to finance the development. We hope to begin some work this winter and will likely continue over the next couple of years.
We intend to install a new seawall along the canal shoreline, dredge the canal, install a marina with a floating dock system, a large boat repair facility, a large inside heated storage building, other supporting services, and a bar/grill on the River shoreline. The attached Site Plan is preliminary and will likely change over time.
Wish us luck!!