Classic Boat Works of the Palm Beaches

Classic Boat Works of the Palm Beaches Specializing in project mgmt and marine carpentry: dedicated to the restoration, preservation, customization and improvement of classic boats of all kinds.

Seam fairing done with sikaflex. She's sanded and ready for first coat of Trinidad thinned. She's a sweet design. 1934 W...
11/20/2018

Seam fairing done with sikaflex. She's sanded and ready for first coat of Trinidad thinned. She's a sweet design. 1934 Wheeler playmate with Hemingways design.

Well now were looking at the future finish on our 1934 Wheeler playmate, and struts are mounted with Ipe' shim blocks ep...
06/29/2018

Well now were looking at the future finish on our 1934 Wheeler playmate, and struts are mounted with Ipe' shim blocks epoxied for 12 degree shaft angle as designed.. Love the black seamed look we're going for..

I had to cap off the mahogany cockpit with handrails, it's not all about original to me, but what's functionally pleasin...
05/12/2018

I had to cap off the mahogany cockpit with handrails, it's not all about original to me, but what's functionally pleasing to my eye.. and we have the struts and shaftlogs all refurbished and positioned for driveline installation for our 1934 40 ft Wheeler on it's new bottom.. The engine cradles have been fabricated, positioned, and ready to powdercoat and install.. It's the little things getting done that excite me..

Were now well on our way to finishing engine beds between new oak bulkheads, and forward stringers, we installed all new...
05/09/2018

Were now well on our way to finishing engine beds between new oak bulkheads, and forward stringers, we installed all new strut planks, new back ribs, and on to cotton seam packing for new Sika 291 black sealant.. the hull is now nearly completed and it feels good.. Jack and Shane are really into their work on this, and it's showing.

Well we've got most of the mahogany planks done, and fairing is underway making this Wheeler strong and proud again..
04/13/2018

Well we've got most of the mahogany planks done, and fairing is underway making this Wheeler strong and proud again..

New mahogany planking fitted and fastened to the oak ribs on the 1934 Wheeler.. progressing well
03/29/2018

New mahogany planking fitted and fastened to the oak ribs on the 1934 Wheeler.. progressing well

Well it's time to say we got it right with the brightwork finish on the 61 Chris Craft sea skiff, and now all the reseam...
03/06/2018

Well it's time to say we got it right with the brightwork finish on the 61 Chris Craft sea skiff, and now all the reseaming on the Wheeler is bringing the shape back to her original lines.. We love our work no matter what to see the satisfaction.. so cool..

I had to redo the stained woodwork as I wasn't satisfied with the depth to the finish I wanted.. getting it right is the...
02/21/2018

I had to redo the stained woodwork as I wasn't satisfied with the depth to the finish I wanted.. getting it right is the ultimate reward to patience .. now it's gorgeous !.. stop into our shop anytime to see what we can do for you..

New live oak keel getting closer to fitting nicely.. great work on the Wheeler..
02/06/2018

New live oak keel getting closer to fitting nicely.. great work on the Wheeler..

Locus stem gripe and knee carved and she's almost better than new again.. love when a plan comes all together.
01/19/2018

Locus stem gripe and knee carved and she's almost better than new again.. love when a plan comes all together.

This piece of locust is the most perfect curved grain for the stem knee, and hard as steel to work. Maybe two hundred gr...
01/09/2018

This piece of locust is the most perfect curved grain for the stem knee, and hard as steel to work. Maybe two hundred growth rings tight

I don't believe work is this rewarding to most men these days, but rebuilding the backbone , the ribs, and the stem of t...
12/16/2017

I don't believe work is this rewarding to most men these days, but rebuilding the backbone , the ribs, and the stem of this boat isn't any work at all... it's magic.

Address

Boynton Beach, FL
33426

Opening Hours

Monday 8am - 4pm
Tuesday 8am - 4am
Wednesday 8am - 4am
Thursday 8am - 4am
Friday 8am - 4am
Saturday 8am - 12pm

Telephone

+13058773850

Website

Alerts

Be the first to know and let us send you an email when Classic Boat Works of the Palm Beaches posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category