10/05/2023
Little progress on the Skiff. Got the mold stations cut and started getting them setup on the strong back. Also started fairing in the stem to take the planking. Next will be machining up the planking. I have a plan to use some 6 1/4 rough sawn Spanish cedar which will require a good amount of work to get it down to 1" x 1/2" with a bead and cove.