B&P Tunnel Replacement

B&P Tunnel Replacement Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from B&P Tunnel Replacement, Travel and transport, Baltimore, MD.

The B&P Tunnel Replacement Program includes over 10 miles of improvements along the Northeast Corridor and features two new key elements - the Frederick Douglass Tunnel and the ADA compliant West Baltimore MARC station.

Thank you to everyone who stopped by our table at  ! It was a great day connecting with the West Baltimore community and...
06/25/2026

Thank you to everyone who stopped by our table at ! It was a great day connecting with the West Baltimore community and sharing Program updates.

See you next year 👋🚧

🚧🦺Trench Safety! We’re highlighting the importance of excavation safety and the measures our teams take to keep worksite...
06/24/2026

🚧🦺Trench Safety! We’re highlighting the importance of excavation safety and the measures our teams take to keep worksites safe. Safety starts with us!

⏰ Trivia Time - Answer RevealQuestion: How many bridges is the B&P Tunnel Replacement Program reconstructing in Baltimor...
06/23/2026

⏰ Trivia Time - Answer Reveal

Question: How many bridges is the B&P Tunnel Replacement Program reconstructing in Baltimore?

Answer: 5! The Mulberry, Franklin, Lafayette, Warwick, and Edmondson Ave bridges will all be reconstructed as part of the BP Tunnel Program. We are committed to building a stronger and sustainable future.

Catch you for our next Trivia Time!

Progress is moving full steam ahead on W Mulberry St 🚧 Sign up today to get construction updates delivered straight to y...
06/22/2026

Progress is moving full steam ahead on W Mulberry St 🚧 Sign up today to get construction updates delivered straight to your inbox—stay on track.

🔗 https://bit.ly/BPT_Contact_Signup

Construction update 🚧 Crews are continuing utility relocation work along McMechen St near the MTA Light Rail station in ...
06/22/2026

Construction update 🚧

Crews are continuing utility relocation work along McMechen St near the MTA Light Rail station in preparation for the future tunnel north portal and ventilation facility. Please use caution when traveling through the work zone.

⏰ Trivia Time!How many bridges in Baltimore is the B&P Tunnel Replacement Program reconstructing?💡 Hint: They're all loc...
06/12/2026

⏰ Trivia Time!

How many bridges in Baltimore is the B&P Tunnel Replacement Program reconstructing?

💡 Hint: They're all located near the West Baltimore MARC Station.

Drop your guess in the comments below! ⬇️👀 Stay tuned for the answer, next week!

YOU spoke, we LISTENED! 🫂The Historic Salvage Program hours have been updated and is now open to the public (outside of ...
06/09/2026

YOU spoke, we LISTENED! 🫂

The Historic Salvage Program hours have been updated and is now open to the public (outside of the Midtown Edmondson or
Greater Rosemont Historic Districts)! 🚨 We’re now offering walk-in Saturdays. No appointment needed! Don't miss your chance to claim FREE material!

🕘 Updated Hours:
Tues, Wed, & Sat: 10AM – 3 PM

📍 Pickup Location:
2150 Harlem Ave (rear entrance), Baltimore, MD 21223

📢 No Eligibility Requirements:
These materials are now available to anyone interested

📞Questions? Contact us: 443-423-1115 ✉️ [email protected]

Happy World Environment Day 🌎🌿Pictured here is the new 126-inch stormwater pipe being installed on N Payson St as part o...
06/05/2026

Happy World Environment Day 🌎🌿

Pictured here is the new 126-inch stormwater pipe being installed on N Payson St as part of the B&P Tunnel Replacement Program. This infrastructure will help improve drainage capacity during heavy rain and snowmelt events, supporting effective stormwater management.

🚨 Reminder: The application deadline for the Amtrak Community Investment Program (CIP) is TOMORROW Friday, June 5, 2026,...
06/04/2026

🚨 Reminder: The application deadline for the Amtrak Community Investment Program (CIP) is TOMORROW Friday, June 5, 2026, by 5:00PM EST.

Please note: ONLY applicants who registered for an Amtrak Grants Portal account by Friday, May 22, 2026, at 5:00 pm EST. will be allowed to submit an application.

Need assistance? Contact [email protected] Monday–Friday, 8 AM–5 PM.

Crews are advancing north along the 900 block of N Payson St, completing excavation work in preparation for the installa...
05/25/2026

Crews are advancing north along the 900 block of N Payson St, completing excavation work in preparation for the installation of a new 126-inch stormwater pipe. The upgrade will improve drainage capacity during heavy rain and snowmelt events.

Address

Baltimore, MD

Alerts

Be the first to know and let us send you an email when B&P Tunnel Replacement posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to B&P Tunnel Replacement:

Share