RLX - Extend the Red Line

RLX - Extend the Red Line We’re a community group working to bring the Red Line to Arlington – and beyond. So why are we working on this? Why do we think there’s a viable path forward?

Laying the Groundwork

Everyone in the Boston area is aware of the current dire state of the T, with regular slowdowns, track closures, and delays messing up our commutes. It’s pretty clear that 2024 isn’t the right year for the MBTA to start building an extension to the Red Line. The short answer is that large infrastructure projects take a long time to proceed, and we want to start the clock on

extending the Red Line. Right now, we’re just asking for the state to conduct a preliminary feasibility study to consider possible routes and construction options for extending the Red Line. Getting started with that study now helps prepare us for when the MBTA’s situation changes. Phillip Eng, the new General Manager of the MBTA, has made great progress in actually fixing the T’s backlog of needed maintenance. The MBTA’s priorities could look very different in 5 or 10 years, especially with the possibility of federal funding for infrastructure that can address climate change. The feasibility study would mean that once the MBTA has recovered and is considering expansion options, it will consider extending the Red Line on an equal footing. A Good Opportunity

Among Boston-area cities and towns that do not have rapid transit stations, Arlington has by far the highest population density. Given their population and importance in the local economy, Arlington, Lexington, Bedford, and Burlington are underserved by the MBTA. Extending the Red Line would increase ridership, reduce carbon emissions and pollution, and alleviate congestion around Fresh Pond and Alewife. While ambitious, extending the Red Line would fill in a large hole in the T's rapid transit map, and because the necessary right of way already exists it would make an excellent midterm project for a revitalized T. There are already tunnels extending from Alewife past Route 2 to Thorndike Field that are used for trains to park and change direction. The existing right of way means the T could use one of the cheapest methods of subway construction: “cut and cover.” With this approach, individual sections of the Minuteman Commuter Bikeway would be temporarily closed so that a trench could be dug down to the level of a subway. The trench would then be roofed over to form a tunnel, after which the bike path would be restored to its original condition on top. Bus Service & Other Advocacy

While we’re named Extend the Red Line, we’re also advocates for better public transportation in general. More frequent bus service and better connections to the Red and Green Lines will reduce trips by car and encourage new housing that doesn’t bring more traffic, as envisioned by the MBTA Communities Act. We want to see at least pre-pandemic levels of service on the 77 bus. More frequent 80 bus service from Arlington Center to Medford/Tufts would allow the T to recoup more of its investment in the Green Line Extension. We also want the T to maintain, rather than eliminate as it plans to do, a bus line on Pleasant St. that connects to Alewife Station. We will also advocate for better bus service for Lexington, Bedford, and Burlington.

IT SHOULDN'T BE ILLEGAL TO PLAN GOOD TRANSIT!The public hearing for Article 30 - Repeal MBTA Prohibition is scheduled fo...
03/17/2026

IT SHOULDN'T BE ILLEGAL TO PLAN GOOD TRANSIT!
The public hearing for Article 30 - Repeal MBTA Prohibition is scheduled for next Monday, March 23 at 7:15 p.m. Check the town website if you want to watch or participate online.

Address

Arlington, MA

Alerts

Be the first to know and let us send you an email when RLX - Extend the Red Line posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share