27/06/2025
M/V "BAI LI 16" camed to Kaohsiung for loading after completing her second task. She was arranged to berth immediately upon arrival to ensure timely connection with the bunkering barge.
Fortunately, the bunkering was completed before the start of loading operations. This time, the loading rate was faster than the previous visit, thanks to the shared experience and smooth coordination among the collaborators. As a result, the loading and lashing of the larger cargoes were completed efficiently in 15.10 hours.