Today, we would like to share with you the details of a multimodal transportation project, highlighting a series of intriguing engineering solutions.
Cargo Volume: 2900 cubic meters
Maximum Length: 48 meters
⚙️ Key Challenge: To expedite delivery time and reduce costs, the task involved the elevation of power lines, given the cargo's dimensions. Additionally, the cargo's center of gravity and dimensions necessitated a dual-crane approach for loading and unloading.
🔷 In light of these factors, Glogos LLC's design department orchestrated the elevation of power lines along the route. The transport of oversized equipment components was accompanied by thorough surveying. Loading and unloading were efficiently managed using a tandem operation of two cranes. A summary of completed tasks can be found on the final card.
⏱ The reduction in the road leg of the journey positively impacted project completion time. Our experts closely oversaw all cargo operations – from loading to transshipment and unloading – ensuring successful outcomes.