01/03/2026
Saturday mission 26400kg machine loaded onto our transporter with the 30t crane and pk85 hiab
Backed into building and placed into its final placement. Alot of planning and test lifts made it all happen in a few hours. Working inside is always harder due to the low head height with the rigging.