PT Mass Rapid Transit Jakarta

PT Mass Rapid Transit Jakarta Increasing mobility, Improving life quality

Rail-based MRT Jakarta will stretch over ±110.3 km Jakarta roads, consists of South-North Corridor (Lebak Bulus – Kampung Bandan) of about 23,3 km and East-West Corridor of about 87 km.

• The construction of South-North Corridor that stretches along Lebak Bulus – Kampung Bandan will be carried out in 2 stages:

- Stage I will be carried out to connect Lebak Bulus with Bundaran HI over 15.2 km rai

lway with 13 stations (7 elevated stations and 6 underground stations) which is targeted to operate by the end of 2016.

- Stage II will expand South-North Corridor from Bundaran HI to Kampung Bandan over 8.1 km railway, which construction will have been initiated before Stage I operates and is targeted to be completed on 2018 (from the earlier target of 2020). Feasibility study for this stage has been completed.

• A pre-feasibility study is on progress for East-West Corridor, which is targeted to operate at the latest on 2024-2027.

“Hari ini kita membangun peradaban baru”
24/03/2019

“Hari ini kita membangun peradaban baru”

Ready or Not, here we go!
24/03/2019

Ready or Not, here we go!

Pembangunan MRT Underground Section dibawah Patung Pemuda Senayan
26/05/2015

Pembangunan MRT Underground Section dibawah Patung Pemuda Senayan