08/10/2026
This weekend was an amazing success, we opened the freight door all the way for the first time, it's quite the sight to see it towering over you for the first time as I'm sure some ex crew could verify.
The starboard flap has been removed and added to the still growing pile of parts.
We've removed another leading edge panel (On the port wing this time) and a few more wing root panels.
And we also opened the No.3 Fuel Tank to check the contents as the guage is showing that there's approximately 4650lbs of fuel in there, fortunately the fuel tank is empty so that's one less problem to deal with, but there was a strong smell of Jet A1 as soon as we cracked the lid so we left it open to ventilate the tank a bit. There's still some fuel in the pipes to deal with but at most there'll be around 150l.
We also helped the XV232 crew remove their port aileron, and this coming weekend the starboard aileron should be off her too.
Big thank you to Ollie, Duane, Sean and everyone else for your help and support, special thanks to Duane for bringing his drone down as well to get some spectacular shots of LOFB and XV232 that we'll be sharing later π