27/06/2026
3 months work in a few minutes!
The burnt out boat was stripped down to bare steel, and then slowly put back together with new panels and roofing, all insulated. The insulated fibreglass wall panels were installed, the insulated roof sections fitted on top, and then we could do the interior details. The engine was removed, serviced, painted, and refitted. The back engine compartment covers were replaced with fibreglass covers, and the guttering that catches the water from the covers was remade in fibreglass.
Then we put in recycled scaffold flooring, a railway sleeper and scaffold staircase, insulation over the hull steel, and closed it in 12mm plywood.
We cut out most of the window apertures and fitted some recycled windows, cleaned and painted.
The front of the boat has now got a folding door with glass planes, so the whole boat is closed up except for the remaining windows that must still be fitted.
That will come later once we are back. We'll be doing a contract away, and then return to finish up.
We have started, but not finished, fitting heat resistant piping into the walls for the diesel heater to blow hot air out of vents in the walls, and some plug boxes for the electrics that will be done later. The kitchen and bathroom will get gas heated water, as well as a reverse osmosis water purification system to utilize water from the river or canal, stored in a water tank and made when needed.
We're excited for the break, and at the same time excited to come back and finish!