07/09/2026
A second post for you all today.
After much effort involving weight calculations, detailed discussions with our scaffolding contractors, Method Statements, Risk Assessments etc, the signalling installation team were ready to complete the er****on of the main components of the NER Northern Division lattice signal by fitting the 'T-Piece' which forms the landing, and the two dolls. As Tim reports in the latest post on the blog, https://ksesignalling.blogspot.com although a few minor 'tweaks' were required to the plans as the job progressed, it was undertaken very successfully and safely.
For those of you wondering why we are erecting NER Northern Division signals, the history is as follows: essentially the S&DR became the NER Central Division. When the Central Division was abolished in 1899, everything west of Barnard Castle East 'box became NER Northern Division. Thus, over time, when minor alterations were made, examples of NER Northern Division signalling began to appear at KSE.
Thus, our approach is to not just rebuild both the S&DR & NER Central Division Junction 'boxes, but also to recreate the mix of NER Central & Northern Division signalling at KSE. This, of course, is not a cheap exercise requiring finding (or producing from surviving components) appropriate drawings, manufacturing patterns, getting components cast, machined etc.
As ever, a huge 'THANK YOU' to all involved in funding and undertaking the work.