22/02/2026
Preparing for a Customer’s keel to be stripped back to bare metal before re-surfacing , faring and protective epoxy coatings applied.
This will all be done without blasting, however the enclosure keeps the grinding dust under control and enables us to heat the work area, and to continue working in this bloody awful weather.