Palma Shipwrights & Joiners

Palma Shipwrights & Joiners Palma Shipwrights & Joiners is about passion for Wood and Boating. Shipwrights and Furniture makers

06/03/2026
04/02/2026

We manufacture bespoke Teak gratings any size, any shape.
Be in touch for your gratings replacement

Teak gratings are one of the jobs often  requested  at the Workshop. We take pride in a handcrafted process, starting wi...
04/02/2026

Teak gratings are one of the jobs often requested at the Workshop. We take pride in a handcrafted process, starting with Teak selection and milling.Gluing is guaranteed by resorcinol red glue for a lifetime bonding. Any size, any shape, any thickness available. Shower trays, passerelle, dinghy or anchors wale, shoe boxes or whatever is your need not hesitate to be in touch about your gratings replacement! Here some shots of successfully delivered projects in Palma

20/01/2026

Any size, any shape any thickness! For your shower basin, your passerelle, tender or anchor wale, we offer a trustworthy handcrafted teak gratings in Palma de Mallorca

A quick makeover and improvement for a bluewater  beauty   100 ft.  on a tight schedule, before her crossing late Novemb...
22/12/2025

A quick makeover and improvement for a bluewater beauty 100 ft. on a tight schedule, before her crossing late November:
✅ Restoration and spraying, since her 1st launching, of Saloon's table and replacement of drawer's runners,
✅ Restoration and varnishing of bulkheads in Crews cabins, adding a sets of in-house designed coat hangers,
✅ Replacement of dated headrests on Crew's Pullman bunks,
✅ New Crew's heads cabinets, improved in space and with secured adjustable shelves and mirrored doors,
✅Repair and manufacturing of new ultra-light sandwich floorboards in the 4 Guest's cabins.
Here few shots (Not that good as in real honestly), about before and after.
What about your winter refit schedule?
Do not hesitate to be in touch about any quality Carpentry, Restoration and Finishing job you want schedule by next spring!
Wishing a Merry Christmas and a Happy New Year all, see you next year with new projects!

A recent project just delivered before Summer break: A  clinker dinghy, on duty on a 112' Yacht, arrived at the Workshop...
04/08/2025

A recent project just delivered before Summer break: A clinker dinghy, on duty on a 112' Yacht, arrived at the Workshop in tired condition, having suffered several breaks and side hits during her last seasons. We have been commissioned for caprail, transom replacement, chain plate, bow and transom reinforcements, over a general re- varnishing and floorboard renovation and antiskid application. Some pictures of the final results and process of the refit. Hope you'll enjoy the result. Happy Summer to you all! ,

26/04/2025

Just delivered.
A Teak decking renovation on a

What's behind a Cupboard's door?Linen and towels storage with a build-in ironing board.Final check, system and lights te...
09/03/2025

What's behind a Cupboard's door?
Linen and towels storage with a build-in ironing board.Final check, system and lights testing before fitting.
A larger storage Cupboard have been manufactured improving existing spaces, featuring large full extraction drawers, shelves and hanging bar, with ironing board.
Improved laundry station make Crew happier! Have you a outdated, poorly designed spaces? Any sizes, style, and systems will be bespoke manufactured, accordingly Yacht needs! Fussy Stewardess are welcome!

Dirección

Camì Establecedores 12
Palma De Mallorca
07007

Horario de Apertura

Lunes 08:00 - 17:00
Martes 08:00 - 17:00
Miércoles 08:00 - 17:00
Jueves 08:00 - 17:00
Viernes 08:00 - 17:00

Teléfono

+34610877887

Notificaciones

Sé el primero en enterarse y déjanos enviarle un correo electrónico cuando Palma Shipwrights & Joiners publique noticias y promociones. Su dirección de correo electrónico no se utilizará para ningún otro fin, y puede darse de baja en cualquier momento.

Compartir