The Surrey Langley SkyTrain project will extend the Expo Line 16 kilometres, primarily along Fraser Highway from King George Station in Surrey to 203 Street in the City of Langley.

History signed and sealed! On July 25, community members had the opportunity to leave their mark and sign a panel enclos...
09/09/2026

History signed and sealed! On July 25, community members had the opportunity to leave their mark and sign a panel enclosed with a concrete guideway segment.

Once the 15 panels of signatures were installed inside the segment, the Langley Launcher installed it into the guideway just east of 64 Avenue in Surrey.

Now the segment and all the signatures form part of the Surrey Langley SkyTrain alignment!

Surrey Sprinter update: in this photo from July, this launching gantry is about to cross 96 Avenue!  Before the Surrey S...
09/09/2026

Surrey Sprinter update: in this photo from July, this launching gantry is about to cross 96 Avenue!

Before the Surrey Sprinter’s arrival, these guideway segments were installed by crane on both sides of the 96 Avenue. The launching gantry now works to connect the segments.

Learn more about Current Work on our website: https://ow.ly/hgao50ZGLtw

Langley Launcher update: this launching gantry is moving steadily towards Langley City!Here, it’s building the span over...
09/08/2026

Langley Launcher update: this launching gantry is moving steadily towards Langley City!

Here, it’s building the span over 64th Avenue, the last major street to cross before arriving at Willowbrook Drive and Willowbrook Station this fall.

Check out our website for more information on launching gantries: https://ow.ly/MaXN50ZyFN5

Have questions about the Surrey Langley SkyTrain project? Come chat with us! We’ll be at Fleetwood Fest next Saturday Se...
09/04/2026

Have questions about the Surrey Langley SkyTrain project? Come chat with us! We’ll be at Fleetwood Fest next Saturday September 12, from 11am to 3pm.

Located at Francis Park in Surrey, we can’t wait to see you all there!

See more details on our website: https://ow.ly/8Teb50ZJw9q

More than three-quarters of the segments have already been produced here! Concrete segments are stored at the precast co...
09/04/2026

More than three-quarters of the segments have already been produced here! Concrete segments are stored at the precast concrete facility until they’re ready for guideway installation.

In the second photo, a gantry crane moves the segments around the yard.

Fleetwood Flyer update: this launching gantry is advancing westward towards 152 Street Station! Here, it’s working just ...
09/03/2026

Fleetwood Flyer update: this launching gantry is advancing westward towards 152 Street Station! Here, it’s working just west of 158 Street.

What behind-the-scenes aspect of construction interests you most?

This aerial shot shows steel beams installed for the guideway west of Highway 15. While most of the guideway is built us...
09/02/2026

This aerial shot shows steel beams installed for the guideway west of Highway 15.

While most of the guideway is built using concrete segments, steel beams are being used in a few locations instead due to design and constructability considerations.

09/01/2026

Last month, the community showed up and joined us in making their mark on this future SkyTrain extension. 15 panels of signatures were signed and placed inside a concrete guideway segment, cementing this moment in time.

Watch as the segment is lifted and installed on the guideway just east of 64 Avenue in Surrey!

Here are more photos from our Sign a Segment event on July 25! So many community members came out and shared their excit...
08/31/2026

Here are more photos from our Sign a Segment event on July 25!

So many community members came out and shared their excitement for the SkyTrain extension. Every available inch of space was filled with signatures, each one representing the people and communities this project will serve!

Didn’t get a chance to sign? Subscribe to our newsletter to stayed tuned for upcoming events: https://ow.ly/34Lu50ZGLob

Check out this shot of crews placing rebar for the foundation of a Propulsion Power Substation (PPS)!These substations s...
08/11/2026

Check out this shot of crews placing rebar for the foundation of a Propulsion Power Substation (PPS)!

These substations supply electrical power to the SkyTrain system. This one is located at Bakerview-166 Street Station.

Can you guess how the location of each substation is determined?

Address

Surrey, BC

Alerts

Be the first to know and let us send you an email when Surrey Langley SkyTrain posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Surrey Langley SkyTrain:

Shortcuts

Share