08/27/2026
NO GATE ACCESS 485 Cree Drive Kamloops
Hi there.
I want to give everyone as much notice as possible.
On Monday August 31, 2026 There will be NO GATE ACCESS from 8am-noon.
Rivermist Excavating will be doing the tie in for the water connection.
Please plan your day accordingly.
If you need access during those times please let me know before 9 am tomorrow (Fri.Aug 27th)
So that I can see if one of the Fountain Tire gates can be used.
If I do not hear from you by 9am on August.27th then secondary gate access will not be available.
I just found out about this so I am scrambling a bit.
Thanks so much, Thea
250-318-0338