14/10/2026
Piling’s done at Culcairn! ☀️🏗️
The crew has finished the entire piling scope at the Culcairn Solar Farm, on schedule and with all the quality checks and ITCs completed.
Two Vermeer PD10 rigs did the heavy lifting, but it’s the team on site who made it happen. Thanks to everyone out there. Next up: mechanical installation. 💪