A 50-tonne industrial rotor immediately attracts attention because of its weight.
But in project cargo, weight is only one part of the challenge.
The real complexity is making sure every phase works in the right sequence:
● Collection at origin
● Inland transport
● Port handover
● Maritime preparation
● Arrival planning
● Destination ex*****on
A shipment can be technically possible and still fail if the handovers are not properly managed.
That is why heavy industrial equipment cannot be treated as a standard freight booking. It needs one transport plan from origin to destination.
We have written about a recent Inoltra project-cargo operation involving the movement of a 50-tonne industrial rotor from Switzerland to Libya, through the Port of Genoa.
Full article: link in comments