27/07/2017
One more important project for A.R.T. Logistics – done!
Gas Producer and Power Turbine (Titan130) with elements of dangerous cargo was carefully delivered along the route Turkmenistan, Lebap velayat through the port of Turkmenbashi - Alyat (Baku) port-Baku Airport - Chicago airport - jobsite in Descoto, USA.
Overall dimensions of the cargo:
5.99 x 2.54 x 2.68 m,
weight - 13844 kg
class of dangerous goods - 2.1.
We had to face the following difficulties:
- Not a standard route with several cargo reloading points due to a change in the type of transport (truck - ferry - truck - air-truck);
- Difficulties in observing the required transit time due to a change in the type of transport along the entire route, due to the lack of a permanent timetable for sending by ferry and air
- The transportation was organized during the national holidays in Turkmenistan and Azerbaijan;
- Features of the work of official services in Turkmenistan, Azerbaijan and the United States.
Despite all the difficulties the cargo was delivered exactly on time and in great condition.
Proud of our Project Team!
[email protected]